This space is reserved for blackgold00 to introduce himself.
sonlite update, production increase RPT DATE 10/01/2012, but is this the production figures for Sept or Oct? bearing in mind that the OM-10 well was worked over in Sept. http://sonlite.dnr.state.la.us/sundown/cart_prod/cart_con_wellinfo2?p_wsn=241566 this from their Nov IMS "At Shoats Creek, the OM 10-1 was worked over in September and the two lowest zones, originally tested in 2010, were put on production. Oil and gas production from the…
I have great respect for many here at stockopedia, especially knowing of their long relation and knowledge of Aminex and knowing that one at least is very much tide by what he can express. I take the silence as expressing a quite confidence that all will be revealed in time, and Aminex's true potential and value will out. As you say Marben, there is one…
The silence speaks volumes.
marben100 "AFAICS the only new thing is that the liner has been run to 2,750m (previous TD) and the well is now drilling ahead. Wonder what took so long?" Yes I wonder, I thought it a little bit interesting if not convenient, that we get the Government of Tanzania's consent to the Assignment before we drill into the prominent seismic event. Tidies up any loose…
Hi peterg, as I understandĀ it, it isĀ the zones from the depth to where the casing was run, at approx 3000mt, through the Aptian/Albian zone (the secondary target), to the top of /or into the Neocomian zone, (the primary target.)They were running wirer line logs before they had finished drilling to TD. so it looks like they could had found something of interest in…
blackgold00 has 0 followers :
